Artigo Revisado por pares

Dynamic risk assessment of metro station with interval type-2 fuzzy set and TOPSIS method

2015; IOS Press; Volume: 29; Issue: 1 Linguagem: Inglês

10.3233/ifs-151573

ISSN

1875-8967

Autores

Yong Qin, Zhenyu Zhang, Xinwang Liu, Man Li, Linlin Kou,

Tópico(s)

Evaluation and Optimization Models

Resumo

Metro station plays crucial social and economic roles in easing metropolitan traffic congestion. To ensure the safe operation of metro station and obtain the real-time risk status of metro station, it is necessary to study dynamic risk assessment of metro station. Based on the real-time data collec ted by data acquisition equipments and research on metro station risk assessment, the dynamic risk assessment index system is established by considering people, equipments, environments, managements and accidents factors together. Considering the fuzzy uncertainty in the process of risk assessment, a new decision model combining interval type-2 fuzzy set and TOPSIS method is proposed and applied to the metro station dynamic risk assessment. The results can reflect the actual risk status of metro stations objectively and are consistent with the real situation. A numerical example case of the metro station in Beijing is used to illustrate the effectiveness and practicality of our methods, which can provide effective decision support for decision-makers.

Referência(s)