Artigo Revisado por pares

Commissioning of the PF Ring after the Reconstruction for the Straight-sections Upgrade

2007; American Institute of Physics; Linguagem: Inglês

10.1063/1.2436012

ISSN

1935-0465

Autores

Tohru Honda, Seiji Asaoka, W. Cheng, K. Haga, Kentaro Harada, Y. Hori, M. Izawa, T. Kasuga, Yukinori Kobayashi, H. Maezawa, A. Mishina, T. Mitsuhashi, Tsukasa Miyajima, Hiroshi Miyauchi, Shinya Nagahashi, Takashi Nogami, T. Obina, C. O. Pak, S. Sakanaka, Hiroyuki Sasaki, Yasuo Satô, Tatsuro Shioya, M. Tadano, Takeshi Takahashi, Yasunori Tanimoto, K. Tsuchiya, Takashi Uchiyama, Akira Ueda, Kensei Umemori, Shigeru Yamamoto,

Tópico(s)

Advanced X-ray Imaging Techniques

Resumo

At the 2.5‐GeV ring of the Photon Factory, a large reconstruction of the lattice around the straight sections has been accomplished in 2005. Thus reconstruction is the main part of the straight‐sections upgrade project to rebuild existing undulators and to increase the number of undulator beamlines. As a result of the reconstruction, four short straight sections have been newly created and the lengths of the existing straight sections have been much extended. To exploit the new straight sections, short‐period narrow‐gap undulators which have a sufficiently high brilliance in hard x‐ray range have been developed. The reconstruction work of the ring was completed in a seven‐month shutdown from March to September, 2005. In the area over two thirds of the storage ring, all the quadrupole magnets and all the beam ducts have been renewed and rearranged to construct the new lattice. Recommissioning of the storage ring was finished at the end of October, 2005. Though we made no in‐situ baking for the beam ducts, recovery of the beam lifetime has favorably progressed due to the vacuum scrubbing by the synchrotron radiation.

Referência(s)
Altmetric
PlumX