Artigo Produção Nacional Revisado por pares

Solution approaches for the soft drink integrated production lot sizing and scheduling problem

2008; Elsevier BV; Volume: 196; Issue: 2 Linguagem: Inglês

10.1016/j.ejor.2008.03.035

ISSN

1872-6860

Autores

Deisemara Ferreira, Reinaldo Morábito, Socorro Rangel,

Tópico(s)

Advanced Manufacturing and Logistics Optimization

Resumo

In this paper we present a mixed integer programming model that integrates production lot sizing and scheduling decisions of beverage plants with sequence-dependent setup costs and times. The model considers that the industrial process produces soft drink bottles in different flavours and sizes, and it is carried out in two production stages: liquid preparation (stage I) and bottling (stage II). The model also takes into account that the production bottleneck may alternate between stages I and II, and a synchronisation of the production between these stages is required. A relaxation approach and several strategies of the relax-and-fix heuristic are proposed to solve the model. Computational tests with instances generated based on real data from a Brazilian soft drink plant are also presented. The results show that the solution approaches are capable of producing better solutions than those used by the company.

Referência(s)