Two parallel machine sequencing problems involving controllable job processing times
1993; Elsevier BV; Volume: 70; Issue: 3 Linguagem: Inglês
10.1016/0377-2217(93)90245-i
ISSN1872-6860
AutoresBahram Alidaee, Ahmad Ahmadian,
Tópico(s)Advanced Manufacturing and Logistics Optimization
ResumoIn this note we consider a problem of scheduling n single-operation jobs on m non-identical machines where the sequencing of the jobs and their processing times are decision variables. It is assumed that the cost of performing a job is a linear function of its processing time. The scheduling cost to be minimized is: (A) the total processing cost plus total flow time, (B) the total processing cost plus total weighted earliness and weighted tardiness. We reduce each problem to a transportation problem that can be solved by a polynomial time algorithm.
Referência(s)