Artigo Acesso aberto Revisado por pares

Puentes Anchurón y Gergal – España

1977; Spanish National Research Council; Volume: 30; Issue: 291 Linguagem: Espanhol

10.3989/ic.1977.v30.i291.2662

ISSN

1988-3234

Autores

Juan Pedro Benito Batanero, Ramiro Rodríguez-Borlado, Carlos Martínez Lasheras, Carlos Mopas Zancajo,

Tópico(s)

Civil and Structural Engineering Research

Resumo

Due to the differences between the loads and speeds of the year the bridges were built and those nowadays, it has been necessary to update their strength and this had to be done suitably separating them, so that the operation could be performed without interrupting traffic. In both cases, the old substructure was taken advantage of, and an original solution, of undeniable interest adopted, consisting of placing a new metal bridge inside the old one. In this article, the delicate operations carried out are described, until the new bridge was put into operation and the new one broken up.

Referência(s)