Artigo Revisado por pares

Study for Highway 407 Transitway System Plan and Station Site Plan

1999; SAGE Publishing; Volume: 1669; Issue: 1 Linguagem: Inglês

10.3141/1669-01

ISSN

2169-4052

Autores

Julius Gorys, Nicholas Poulos, Al Ruggero,

Tópico(s)

BIM and Construction Integration

Resumo

A 36-km section of a tolled highway bypass of Toronto, the Highway 407 Express Toll Route, has been completed and is in operation. Included in the planning for the aforementioned is a “transitway” function. A property protection study was initiated to develop a transitway system plan and a station site plan. This study generated estimates of future transit ridership and developed hierarchical station configurations based on technology choices.

Referência(s)