MEASURES OF PROTECTION AND CONSOLIDATION OF RAILWAY SLOPES DURING OPERATION PERIOD FOR A REHABILITATED RAILWAY LINE STRETCH

2010; Agroprint Timisoara; Volume: 42; Issue: 3 Linguagem: Inglês

ISSN

2066-1843

Autores

C. A. Peptan, L. Bârliba, Monica Mirea, Alin Ionel Ienciu,

Tópico(s)

Environmental and Ecological Studies

Resumo

The objective of the present study is that to mitigate the foresee impacts from the railway line rehabilitation works. At the same time the mitigations measures have the aim to environmental rehabilitation, in the operation phase, with the objective to the global environmental rehabilitation of the interested areas of the Banat Plan, Mures Valley and Deva Depression which intersects with the railway line Curtici-Simeria. According to the capital estimate of mitigations measures to the environmental impact, the investment in the environmental protection of the rehabilitation and upgrade project is primarily defined in about 3% of the total investment. Among the mitigation measures, we mention: slopes stabilization, drainage and erosion control, protection drainage (gabions); bioengineering techniques; re-vegetation (workers, planting stock, transport of planting material); installation of noise barriers and installations of traffic signs and road bumps.

Referência(s)