Temburong Bridge, Brunei – Environmental Impact Study and Mitigation Measures
2015; Volume: 105; Linguagem: Inglês
10.2749/222137815818359519
ISSN2221-3783
AutoresSteve Kite, Naeem Hussain, Franki Chiu, Garry Anderson, Hj Mazlan Abd Salim, Kok Kong Chin,
Tópico(s)Structural Integrity and Reliability Analysis
Resumo<p>The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will connect the relatively isolated district of Temburong with the more developed Brunei-Muara district. The route alignment, selected to have the minimum environmental impact, goes across the Mentiri Hills and then crosses over the shallow waters of Brunei Bay and through the mangrove and peat swamp forest in Temburong.</p><p>An Environmental Impact Assessment (EIA) was carried order to identify, assess, and mitigate the primary environmental risks associated with the construction and operation of the project. This paper describes the study and mitigation measures both during construction and operation.</p>
Referência(s)