Temburong Bridge, Brunei – CC4 Swamp Crossing in Temburong District

2015; Volume: 105; Linguagem: Inglês

10.2749/222137815818359573

ISSN

2221-3783

Autores

Chi-Ho Poon, Sammy Yip, Paresh Vishnoi, Naeem Hussain, John C. Cain,

Tópico(s)

Structural Engineering and Vibration Analysis

Resumo

<p>The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will connect the relatively isolated district of Temburong with the more developed Brunei-Muara district. The project includes approximately 12 km of low level piled slab viaduct structure crossing a peat swamp forest in the Temburong District (CC4 Contract).</p><p>The peat swamp forest has unique and endangered flora and fauna. The soil conditions consist of soft peat overlying soft marine clay with depths exceeding 70m. In order to permit a fast track construction method with minimal disturbance to the environment, the design required a simple yet innovative solution.</p><p>This paper describes the design of the viaducts, focusing on the development, decisions and details adopted to aid the construction method.</p>

Referência(s)
Altmetric
PlumX