Penang Bridge Stay Cable Replacement

2012; Volume: 18; Linguagem: Inglês

10.2749/222137912805112068

ISSN

2221-3791

Autores

Huy Lam, Haythem Amami, Arnaud Lemaire, Mohamed Ketfi, Serge Montens,

Tópico(s)

Structural Engineering and Materials Analysis

Resumo

<p>Systra carried out the design of the replacement of the remaining 117 original stay cables on Penang Cable Stayed Bridge. This paper describes the design methodology for the replacement of stay cables and provides the key parameters for determining the schedule of stay cables final setting.</p>

Referência(s)
Altmetric
PlumX