Temburong Bridge, Brunei – Ground Engineering - Part 1: Engineering Geology

2015; Volume: 105; Linguagem: Inglês

10.2749/222137815818359537

ISSN

2221-3783

Autores

Thomas D. Bush, Stuart Millis, Erin H. Y. Leung, Eoin Wyse,

Tópico(s)

Geotechnical Engineering and Underground Structures

Resumo

<p>The new 30 km Cadangan Projek Jambatan Temburong (Temburong Bridge Project) in Brunei will provide a highway link between the two separated parts of Brunei, by spanning Brunei Bay. The entire project site is underlain by geologically young, deltaic sandstones and mudstones of the Miocene-aged Belait formation. A thick mantle (&gt;90m in places) of recent, late-Quaternary, superficial deposits blankets the upper undulating erosional surface of the Belait formation within the offshore and swamp areas of the alignment, which comprise about 90% of its length. This paper on the Ground Engineering aspects of the project focuses on the interpretation of the complex ground conditions encountered along the alignment and the various challenges such conditions provided to the design.</p>

Referência(s)
Altmetric
PlumX