Temburong Bridge, Brunei

2015; Volume: 105; Linguagem: Inglês

10.2749/222137815818359582

ISSN

2221-3783

Autores

Matthew Carter, Sammy Yip, Naeem Hussain, Kok Kong Chin, Lee Sing Ding, Siew Long Lim,

Tópico(s)

Structural Engineering and Vibration Analysis

Resumo

<p>Temburong district has been physically isolated from the rest of Brunei which has hindered the economic growth of the district. A sea-crossing is planned to link the district to Brunei-Muara. A feasibility study was carried out between 2010 and 2012 to establish the alignment and preliminary design of the link, assess the project impacts and analyse the costs and benefits.</p>

Referência(s)
Altmetric
PlumX