Temburong Bridge, Brunei
2015; Volume: 105; Linguagem: Inglês
10.2749/222137815818359582
ISSN2221-3783
AutoresMatthew Carter, Sammy Yip, Naeem Hussain, Kok Kong Chin, Lee Sing Ding, Siew Long Lim,
Tópico(s)Structural Engineering and Vibration Analysis
Resumo<p>Temburong district has been physically isolated from the rest of Brunei which has hindered the economic growth of the district. A sea-crossing is planned to link the district to Brunei-Muara. A feasibility study was carried out between 2010 and 2012 to establish the alignment and preliminary design of the link, assess the project impacts and analyse the costs and benefits.</p>
Referência(s)