Artigo Acesso aberto Revisado por pares

An integrated econometric model for bus replacement and determination of reserve fleet size based on predictive maintenance

2017; Volume: 19; Issue: 3 Linguagem: Inglês

10.17531/ein.2017.3.6

ISSN

2956-3860

Autores

Hugo Raposo, José Torres Farinha, Luís Ferreira, Diego Galar,

Tópico(s)

Advanced Battery Technologies Research

Resumo

An integrAted econometric model for bus replAcement And determinAtion of reserve fleet size bAsed on predictive mAintenAnce zintegrowAny ekonometryczny model do modelowAniA wymiAny tAboru Autobusowego orAz określAniA wielkości floty rezerwowej w opArciu o konserwAcję predykcyjną Maintenance policies influence equipment availability and, thus, they affect a company's capacity for productivity and competitiveness.It is important to optimize the Life Cycle Cost (LCC) of assets, in this case, passenger bus fleets.The paper presents a predictive condition monitoring maintenance approach based on engine oil analysis, to assess the potential impact of this variable on the availability of buses.The approach has implications on maintenance costs during the life of a bus and, consequently, on the determination of the best time for bus replacement.The paper provides an overview of economic replacement models through a global model, with an emphasis on availability and its dependence on maintenance and maintenance costs.These factors help to determine the size of the reserve fleet and guarantee availability.

Referência(s)