PLANNING, SCHEDULING, TRACKING OF RESIDENTIAL BUILDING USING PRIMAVERA SOFTWARE P6

2017; IJARIIE; Volume: 3; Issue: 4 Linguagem: Inglês

ISSN

2395-4396

Autores

H M Sangeetha, S J Rajeeva, Gouda Narayan,

Tópico(s)

BIM and Construction Integration

Resumo

In Project Management, proper arrangement and setting up is very essential element. Planning is a base for each and every work in management field. It serves as base for executing, monitoring and controlling and closing. When quality time is spent on planning, it will fundamentally minimize the time spent on execution. Planning manages chalking out a future strategy and choosing ahead of time the most suitable course of activities for accomplishment of predefined objectives. Planning ensures a head of time-what to do, when to do and how to do. It gives an idea about where we are and where we need to be. It is a bridge between present and future course of action. Thus planning is nothing but think before it is executed. Planning is a systematic/orderly thinking about way and needs to reach the determined goal/ destination. Planning is an activity in critical thinking. It helps in avoiding instabilities, confusion, delay of work, unexpected risk, wastages etc. This paper deals with the planning, scheduling and tracking of a residential building at New town, Yelahanka which has 116 flats (G+4) where construction is in progress. This paper also ensures a comparison between the baseline duration and cost to actual duration of project using project management software tool Primavera P6

Referência(s)