Artigo Acesso aberto Revisado por pares

The Impact of Delays of Freight Trains in JIT System on Example One Track Line

2017; EDP Sciences; Volume: 134; Linguagem: Inglês

10.1051/matecconf/201713400011

ISSN

2274-7214

Autores

Matúš Dlugoš, Lumír Pečený, Pavol Meško, Peter Šulko,

Tópico(s)

Urban Transport Systems Analysis

Resumo

The paper describes the problem between freight trains operated by Metrans Danube, a.s. and passenger trains operated by Regiojet, a.s on the line Bratislava – Dunajská Streda - Komárno. It is very important to emphasize this problem because, nowadays, mostly freight trains across the Europe drive in just in time system, it means, that shipments are delivered at exact time and place on time. At this line there are many problems not only this track line is single track, so it is necessary to cross the trains very often in traffic points which maximum 2 traffic tracks but also organizing of transport is more complicated which is provided by Railway infrastructure manager – this case is very important example when railway traffic technology slows down all processes in the logistic chain.

Referência(s)