Establishing an Efficient Low-Carbon Power System by Reducing Curtailment of Renewable Energy using ESS : The Case of Jeju Island in 2025

2022; Volume: 13; Issue: 1 Linguagem: Inglês

10.15531/ksccr.2022.13.1.001

ISSN

2586-2782

Autores

Wooyoung Jeon, Jin-yi Kim, Sungwoo Lee,

Tópico(s)

Hybrid Renewable Energy Systems

Resumo

Due to the ambitious carbon net-zero target by 2050, deployment of variable renewable energy (VRE) sources has been accelerated. However, the duck curve problem caused by massive generation of solar photovoltaics increases the possibility of VRE curtailment, leading to increasing power supply cost due to reduced capacity factor of VRE. This study estimates hourly amount of VRE curtailment and analyzes an energy storage system (ESS) as a viable option to mitigate curtailment based on the Jeju Island power system in 2025. The power system optimization model called PLEXOS is used to estimate the amount of curtailment, and a profit maximization model is applied to analyze the economic feasibility of ESS. The result shows that the economic feasibility of ESS was higher when applying system marginal price (SMP) 0 KRW/kWh when VRE is curtailed compared to the case of applying SMP on the mainland. At the ESS capacity that can achieve 25% total curtailment reduction, an internal rate of return (IRR) of 4.99% is achieved; with a lower ESS capacity, an IRR of 6 ~ 8% can be achieved. This result suggests that ESS is a viable option to reduce VRE curtailment to an appropriate level to operate such a power system efficiently.

Referência(s)