Modification of CAPP systems for CAPP/scheduling integration
1994; Elsevier BV; Volume: 26; Issue: 3 Linguagem: Inglês
10.1016/0360-8352(94)90042-6
ISSN1879-0550
AutoresT. Warren Liao, Eyler Robert Coates, F. Aghazadeh, Lawrence Mann, N. Guha,
Tópico(s)Advanced Manufacturing and Logistics Optimization
ResumoThis paper presents a new approac—through the modification of an existing CAPP system, i.e. CMPP—for achieving CAPP/scheduling integration. An operation-machine index is developed as a relative measure for selecting the best machine from all the alternatives in the processs planning stage to satisfy two scheduling criteria: mean flow time and number of jobs tardy. The software program for implementing the integrated system has been written in C. A sample part is used to illustrate that both the mean flow time and the number of jobs tardy can be reduced with the use of the integrated system.
Referência(s)