New cubipod® armoured breakwater in Hanstholm, design and construction

2024; Linguagem: Inglês

10.1680/jmaen.24.00004

ISSN

1751-7737

Autores

Henning Lauridsen, Thomas Gierlevsen, Jonas Ostersen, Ole Juul Jensen, Antonio Corredor Molguero,

Tópico(s)

Coastal and Marine Dynamics

Resumo

The expansion of the Port of Hanstholm, located on the exposed North Sea coast of Denmark has been carried out from 2017-2020. The port expansion features a new large western breakwater in 9-13.5m water depth with 15t to 32.5t Cubipods® as main protective armour. The breakwater head towards the harbour entrance is established by a large prefabricated concrete caisson (40×22×18m). Detailed design of the breakwater, the largest ever built in Denmark, was carried out by COWI A/S for the marine contractor Per Aarsleff A/S, who won the port expansion design-build contract. This paper presents the design consideration for the new western breakwater, including considerations of different breakwater concepts and details on why Cubipods® in one layer was eventually chosen as the preferred armour for the breakwater.

Referência(s)